Reports

This section contains reports relating to the McLean’s Mountain Wind Farm Project. As this is an archive of older documents, some of these documents may be superseded by reports in the "REA Final Environmental Documents" section.

17 September 2012

Bird and Bat Environmental Effects Monitoring Plan
Natural Heritage Environmental Effects Monitoring Plan

17 January 2010Draft REA Reports (Only available in English)

Below is the draft REA submission package that was submitted to the MOE during the transition to the REA process.
McLean’s Mountain Wind Project – Renewable Energy Approval (REA) Draft Submission Package – Jan. 2010 (3.9 MB)
REA – Submission Cover Letter
REA – Section 1: Concordance Table
REA – Section 2: The McLean’s Mountain Wind Farm ESR/EIS July 2009 Comment/Response Table
REA – Section 3: Supplementary REA Reports
REA – Section 4: Supplementary Mapping

23 July 2009Environmental Screening Report (Only available in English)

Below is the Environmental Screening Report and supporting documents under Ontario Regulation 116/01 Electricity Projects.
McLean’s Mountain Wind Farm – ESR – July ’09
Appendix A: Turbine Coordinates
Appendix B: Stakeholder Consultation Report
Appendix C: Natural Environment Report
Appendix D: Bird Study Report
Appendix E: Bat Study Report
Appendix F: Archaeology Report
Appendix G: Noise Analysis Report
Appendix H: Visual Assessment Report
Appendix I: Shadow Flicker Report
Appendix J: Aboriginal Consultation Summary