Reports

This section contains reports relating to the McLean’s Mountain Wind Farm Project.

1 November 2012

Renewable Energy Approval

17 September 2012

Cultural Heritage Assessment
Environmental Effects Monitoring Plan (EEMP) - October 2012
Stage 2 Archeological Assessment, Part Lots 13-16, Concession 1; Part Lots 12-14, Concession 2
Stage 2 Archeological Assessment, Part Lots 12-165, Concession 3; Part Lot 24, Concession 12

15 August 2012

Revised Final Noise Study Report

24 November 2011FINAL REA REPORTS (Only available in English)

Below are the Final Renewable Energy Approval (REA) Reports that have been submitted to the Ministry of Environment under Ontario Regulation 359/09. These reports were submitted to the Ministry on September 19, 2011 and posted to the Environmental Registry on November 24, 2011. The public has a 60 day comment period following the posting to the EBR. This comment period will end on January 23, 2012. To submit a comment please go to www.ebr.gov.on.ca and search the project reference number: 011-5195.

The final REA reports will be available at the NEMI Public Library for public review until January 23, 2012. The Library is located at 50 Meredith Street West, Little Current, ON.

Final Project Description Report (3.9 MB)
Final Construction Plan Report (7.8 MB)
GE Specification on Site Roads and Crane Pads (5.2 MB)
Final Design and Operations Report - Section 1 (9.4 MB)
Final Design and Operations Report - Section 2 (3.2 MB)
GE Maintenance Checklist (2.38 MB)
Final Decommissioning Plan Report (902 KB)
Final Property Line Setback Report (1.3 MB)
Final Wind Turbine Specification Report (1.4 MB)
GE Specs – Technical Description and Data (3.56 MB)
GE Acoustic Specifications (1.02 MB)
Final Water Assessment Environmental Impact Statement (6.2 MB)
Final Water Assessment Records Review Report (4.6 MB)
Final Water Assessment Site Investigation - Section 1 (9.6 MB)
Final Water Assessment Site Investigation - Section 2 (8.8 MB)
Final Noise Study Report - Also available as Appendix B of the Design & Operations Report (5.9 MB)
Final Consultation Report (1.8 MB)
Final Consultation Report - Appendix A (3.4 MB)
Final Consultation Report - Appendix B - Section 1 (7.8 MB)
Final Consultation Report - Appendix B - Section 2 (9.2 MB)
Final Consultation Report - Appendix C - Section 1 (3.3 MB)
Final Consultation Report - Appendix C - Section 2 (9.8 MB)
Final Consultation Report - Appendix C - Section 3 (4.4 MB)
Final Consultation Report - Appendix C - Section 4 (6.9 MB)
Final Consultation Report - Appendix D (525 KB)
Final Consultation Report - Appendix E - Section 1 (6.0 MB)
Final Consultation Report - Appendix E - Section 2 (9.8 MB)
Final Consultation Report - Appendix E - Section 3 (6.1 MB)
Final Consultation Report - Appendix E - Section 4 (8.9 MB)

13 September 2011FINAL NATURAL HERITAGE ASSESSMENT REPORTS (Only available in English)

Below are the Final Natural Heritage Assessment Reports required under the REA.
Environmental Impact Study (10.4 MB)
Natural Heritage Records Review Report (9.24 MB)
Site Investigation Report (11 MB)
Site Investigation Report - Appendix A Supplementary Information (2.6 MB)
Site Investigation Report - Appendix B CVs (540 KB)
Site Investigation Report - Appendix C Weather Data and Field Notes - Section 1 (530 KB)
Site Investigation Report - Appendix C Weather Data and Field Notes - Section 2 (13.5 MB)
Site Investigation Report - Appendix C Weather Data and Field Notes - Section 3 (8.9 MB)
Site Investigation Report - Appendix C Weather Data and Field Notes - Section 4 (10.8 MB)
Site Investigation Report - Appendix C Weather Data and Field Notes - Section 5 (4.9 MB)
Site Investigation Report - Appendix D Photographs (2.78 MB)
Site Investigation Report - Appendix E Species (784 KB)
Evaluation of Significance Report (19.1 MB)